Zhengzhou Protech Technology Co., Ltd
phone +8617719806024
email info@lab-furnace.com
Zhengzhou Protech Technology Co., Ltd
about us
Home > Technical Articles

PRODUCT MENU

Technical Articles

Precautions for using the muffle furnace after long-term shutdown

Time:2020-06-17 17:23:13
Note precautions for reuse after long-term shutdown:k3bZhengzhou Protech Technology Co., Ltd
muffle furnacek3bZhengzhou Protech Technology Co., Ltd
1. When the muffle furnace is used for the first time or it is used again after being out of service for a long time, it must be dried. The oven drying time shall be at room temperature 200 ℃ for four hours. 200 ℃ to 600 ℃ for four hours. When in use, the maximum furnace temperature shall not exceed the rated temperature, so as to avoid burning the electric heating elements. It is forbidden to pour various liquids and soluble metals into the furnace. The muffle furnace shall be operated below the maximum temperature of 50 ℃ as far as possible. After the muffle furnace is out of service for a long time, the furnace wire has a long service life.k3bZhengzhou Protech Technology Co., Ltd
k3bZhengzhou Protech Technology Co., Ltd
2. Muffle furnace and controller must work in the place with relative humidity no more than 85%, no conductive dust, explosive gas or corrosive gas. When metal materials such as grease need to be heated, a large number of volatile gases will affect and corrode the surface of electric heating elements, so as to destroy and shorten their service life. Therefore, when heating, it is necessary to timely prevent and seal the container or properly open holes to eliminate.k3bZhengzhou Protech Technology Co., Ltd
k3bZhengzhou Protech Technology Co., Ltd
3. The controller shall be limited to the range of 0-40 ℃ ambient temperature.k3bZhengzhou Protech Technology Co., Ltd
k3bZhengzhou Protech Technology Co., Ltd
4. According to the technical requirements, regularly check whether the wiring of the electric furnace and controller is in good condition, whether the pointer of the indicator is stuck when it moves, and the matters needing attention during the secondary use such as demagnetization, wire expansion, fatigue of the shrapnel, and the increase of the error caused by the balance damage.k3bZhengzhou Protech Technology Co., Ltd
k3bZhengzhou Protech Technology Co., Ltd
5. Do not pull out the thermocouple suddenly in case of high temperature, so as to prevent the jacket from cracking.k3bZhengzhou Protech Technology Co., Ltd
k3bZhengzhou Protech Technology Co., Ltd
6. Keep the furnace clean and remove oxides and other things in time.k3bZhengzhou Protech Technology Co., Ltd
k3bZhengzhou Protech Technology Co., Ltd
The above is the precautions of muffle furnace, which can prolong the service life of the machine better.
k3bZhengzhou Protech Technology Co., Ltd

HOT PRODUCTS

  • Continuous feeding and discharging multi temperature zone large diameter rotary furnace
  • Tube type vertical lifting bell cover furnace
  • 1200 ℃ touch screen high-temperature vacuum tube furnace
  • Large vertical tube furnace with preheating

Inquiry

Please leave a message here. We will reply you in 24 hours.

live chat customer service