1 .What to prepare before opening the furnacexyaZhengzhou Protech Technology Co., Ltd
1.1 Check whether there are tools or other conductive materials in the electrical control box. If there are any forgotten workpieces in the furnace body, remove them in time.xyaZhengzhou Protech Technology Co., Ltd
1.2 After closing, check whether the switch electrical contact is positive or not.xyaZhengzhou Protech Technology Co., Ltd
1.3 Check whether the temperature control instrument is working properly, and turn on its button to make it in the working state.xyaZhengzhou Protech Technology Co., Ltd xyaZhengzhou Protech Technology Co., Ltd
2 .Open furnace productionxyaZhengzhou Protech Technology Co., Ltd
2.1 Set the temperature of the automatic temperature control instrument according to the process requirements.xyaZhengzhou Protech Technology Co., Ltd
2.2 Put the control "handle" on the intelligent control position to raise the temperature.xyaZhengzhou Protech Technology Co., Ltd
2.3 The temperature of the cold furnace is increased, and the workpiece can be loaded into the workpiece after the temperature is maintained for 2 hours, and continuous production is allowed.xyaZhengzhou Protech Technology Co., Ltd
2.4 The parts should be placed evenly and stably in the box furnace, and no contact between the parts and the heating wire is allowed.xyaZhengzhou Protech Technology Co., Ltd
2.5 Operate strictly in accordance with the technical specifications.xyaZhengzhou Protech Technology Co., Ltd xyaZhengzhou Protech Technology Co., Ltd
3 .Stop the furnace! Turn off the switch of the digital display and open the electric switch.xyaZhengzhou Protech Technology Co., Ltd xyaZhengzhou Protech Technology Co., Ltd
4 .Operation FAQxyaZhengzhou Protech Technology Co., Ltd
4.1 When the furnace temperature is greater than 400 ℃, it is not allowed to open the furnace mouth intensely.xyaZhengzhou Protech Technology Co., Ltd
4.2 The maximum operating temperature does not exceed the power temperature.xyaZhengzhou Protech Technology Co., Ltd
4.3 The furnace load cannot be too large, and the temperature reduction caused by it should not exceed 40℃.xyaZhengzhou Protech Technology Co., Ltd
4.4 Do not use too much force when installing the furnace to prevent damage to the furnace bottom.xyaZhengzhou Protech Technology Co., Ltd