Laboratory Muffle furnace rules

Time:2015-04-21 09:35:27
In terms of the production of electric heating furnace has 20 years of history in Zhengzhou Protech Tube furnace Limited.F7iZhengzhou Protech Technology Co., Ltd
Here we explain Laboratory Muffle furnace operating procedures.F7iZhengzhou Protech Technology Co., Ltd
1, the power, turn on the power switch, indicator light, into the working state, the meter displays the ambient room temperature.F7iZhengzhou Protech Technology Co., Ltd
2, the temperature setting on the temperature control knob or DIP switches to adjust to the desired temperature value, when the green light on the instrument, said heating furnace is energized, said the power outage holding a red light, when the traffic light alternates that enter constant temperature. When the thermostat 30 minutes after the meter indicates the temperature and setpoint values are basically the same.F7iZhengzhou Protech Technology Co., Ltd
3, KSW type is directly controlled, no current regulation, because the heating element is gold, its resistance is substantially constant, so that electric power is constant, the control may be direct.
F7iZhengzhou Protech Technology Co., Ltd
 
4, KSW type of current regulation type, which controls the heating element is silicon carbide. Characteristic of silicon carbide is the resistance at low temperature is small, so great power, with increasing temperature the resistance increases, so it is necessary to mediate its power at low temperatures, which is reflected in the size of the power ammeters and voltmeters on. Note that the voltmeter shows voltage of the output voltage and current which is equal to the product of its power, this power can not be greater than the rated power of the controller,so before turning the adjustment knob should be placed in the smallest bit Ge,then gradually to the big picture regulate and observe the ammeter display,not avoid the situation suddenly to the maximum.F7iZhengzhou Protech Technology Co., Ltd
5, the power must be installed at the introduction of leakage protection.F7iZhengzhou Protech Technology Co., Ltd
6, the current capacity of the power supply must meet the electric power needs.F7iZhengzhou Protech Technology Co., Ltd
7, the controller can not be too close to the furnace.F7iZhengzhou Protech Technology Co., Ltd
8, the indoor temperature is not greater than 85%, and its surroundings must not put flammable and corrosive materials disposal.F7iZhengzhou Protech Technology Co., Ltd
9, furnace and controller housing must be properly grounded.F7iZhengzhou Protech Technology Co., Ltd
10, when the furnace for the first time or re-used long-term disabled and must be oven, oven time, four hours at room temperature to 200 ℃ to 600 ℃ ?200 ℃ four hours. 1300 ℃ furnace 200 ℃ one hour, 200 ℃ to 500 ℃ two hours, 500 ℃ to 800 ℃ three hours, 800 ℃ to 1200 ℃ two hours, when the furnace temperature should not exceed the maximum use temperature, to avoid burning the heating element, and prohibits the furnace in the perfusion of various liquids and dissolved metals.F7iZhengzhou Protech Technology Co., Ltd
11, the furnace and the controller must not exceed 85% relative humidity, no explosive gas and conductive dust can damage electronic components and metal insulation corrosive gases workplace.F7iZhengzhou Protech Technology Co., Ltd
12, the controller operating temperature is limited to 0-50 ℃.F7iZhengzhou Protech Technology Co., Ltd
13, according to the technical requirements, always check the furnace regularly connect the controller terminals is good, whether the phenomenon stuck sluggish indicator pointer movement and electricity potentiometer calibrated to avoid errors due to various causes too.

HOT PRODUCTS

  • Continuous feeding and discharging multi temperature zone large diameter rotary furnace
  • Tube type vertical lifting bell cover furnace
  • 1200 ℃ touch screen high-temperature vacuum tube furnace
  • Large vertical tube furnace with preheating

Inquiry

Please leave a message here. We will reply you in 24 hours.

live chat customer service