Zhengzhou Protech Technology Co., Ltd
phone +8617719806024
email info@lab-furnace.com
Zhengzhou Protech Technology Co., Ltd
about us
Home > News

PRODUCT MENU

News

Laboratory Muffle furnace use

Time:2015-04-23 09:42:43
1. Laboratory Muffle furnace useRYzZhengzhou Protech Technology Co., Ltd
1.1 Checking Laboratory Muffle furnace, temperature controller and thermocouple wire is intact special compensation. Manual, certificate is complete, read the instructions carefully and follow the installation and operating instructions of the installer.RYzZhengzhou Protech Technology Co., Ltd
1.2 The furnace temperature controller level on the bench, in accordance with the electrical connection diagram shown, with the corresponding cross-sectional area of ​​copper insulated wire to make a reliable connection, the device should be connected with reliable shell protective earthing or protect access to zero. The distance between the furnace temperature controller and not too close, to prevent the normal working environment temperature is too high due to the effects of temperature controllers. Thermocouple wire should be connected with the compensation can not pay attention to the polarity wrong, thermocouple terminal polarity clearly marked polarity compensation wire by wire insulation colors to distinguish, where red is positive, blue or Green is negative.RYzZhengzhou Protech Technology Co., Ltd
1.3 When the furnace initial use or re-use long-term disabled and must be oven dried. Ovens follows: power after setting knob is set at 200 ℃ for four hours, and the door open for a little, to let go of moisture. Then set the knob to set to work four hours at 600 ℃, oven dry ends.RYzZhengzhou Protech Technology Co., Ltd
1.4 Ovens finished Laboratory Muffle furnace can start normally.RYzZhengzhou Protech Technology Co., Ltd
1.5 Laboratory Muffle furnace using a temperature controller: Turn on the power switch, power switch indicator light, said power supply has been switched on, the value when the temperature control instrument displays the current temperature inside the furnace. Conducted in accordance with the desired operating temperature of the temperature setting, after setting the temperature controller of the green light indicates that the controller can start working.RYzZhengzhou Protech Technology Co., Ltd
1.6 Fill use after use after recording.

HOT PRODUCTS

  • Continuous feeding and discharging multi temperature zone large diameter rotary furnace
  • Tube type vertical lifting bell cover furnace
  • 1200 ℃ touch screen high-temperature vacuum tube furnace
  • Large vertical tube furnace with preheating

Inquiry

Please leave a message here. We will reply you in 24 hours.

live chat customer service