Technical Requirements box-type furnace

Time:2015-06-03 09:00:21
Box-type furnace operating techniques are as follows:wKdZhengzhou Protech Technology Co., Ltd
1 prepared in BFwKdZhengzhou Protech Technology Co., Ltd
1.1 Check electrical control box is not there something or other conductive material, the furnace if the presence of a forgotten piece should be promptly removed.  wKdZhengzhou Protech Technology Co., Ltd
1.2 Closing After checking electrical switch touch is not normal.  wKdZhengzhou Protech Technology Co., Ltd
1.3 Check the temperature control instrumentation work is not normal, and open its switches at job status.wKdZhengzhou Protech Technology Co., Ltd
2 furnace production  wKdZhengzhou Protech Technology Co., Ltd
2.1 The automatic temperature control instruments according to technical needs will be a good temperature.  wKdZhengzhou Protech Technology Co., Ltd
2.2 The temperature program in the automatic control of the position of warming.  wKdZhengzhou Protech Technology Co., Ltd
2.3 Long-term do not use the stove or humid, it is necessary to bake before normal use.  wKdZhengzhou Protech Technology Co., Ltd
2.4 parts should be placed in the furnace uniform, smooth, not allowed to touch the parts and electric wire.  wKdZhengzhou Protech Technology Co., Ltd
2.5 operate in strict accordance with technical regulations.wKdZhengzhou Protech Technology Co., Ltd
3 shutdown! Switch off the meter, and laid the power switch.wKdZhengzhou Protech Technology Co., Ltd
4 Handling Precautions  wKdZhengzhou Protech Technology Co., Ltd
4.1 furnace temperature higher than 400 ℃ not allowed to open the door dramatic cooling.  wKdZhengzhou Protech Technology Co., Ltd
4.2 maximum use temperature does not exceed the additional temperature.  wKdZhengzhou Protech Technology Co., Ltd
4.3 installed furnace capacity will not do too much, causing the temperature drop should not exceed 50 ℃.  wKdZhengzhou Protech Technology Co., Ltd
4.4 installed furnace do not overexert, to avoid damage to the furnace, the furnace bottom.  wKdZhengzhou Protech Technology Co., Ltd
4.5 constant attention instrumentation and electrical control box electrical work is not normal.

HOT PRODUCTS

  • Continuous feeding and discharging multi temperature zone large diameter rotary furnace
  • Tube type vertical lifting bell cover furnace
  • 1200 ℃ touch screen high-temperature vacuum tube furnace
  • Large vertical tube furnace with preheating

Inquiry

Please leave a message here. We will reply you in 24 hours.

live chat customer service