Procedure Protech vacuum furnace

Time:2015-07-06 09:38:56
1, open oven ready84pZhengzhou Protech Technology Co., Ltd
1) Check the electrical fittings are tight and the components are clean, normal.84pZhengzhou Protech Technology Co., Ltd
2) Measure the insulation resistance of not less than 2,000 in Europe.84pZhengzhou Protech Technology Co., Ltd
3) adjusting the temperature control instruments, time relays, etc., to match the thermal process specification requirements.84pZhengzhou Protech Technology Co., Ltd
4) Open the back filled with nitrogen switch.84pZhengzhou Protech Technology Co., Ltd
5) Open the pneumatic air supply switch.84pZhengzhou Protech Technology Co., Ltd
6) Turn on the main water-cooling system switch.84pZhengzhou Protech Technology Co., Ltd
7) The main power switch is closed.84pZhengzhou Protech Technology Co., Ltd
8) The magnetic regulator, control the master switch on the cabinet together.84pZhengzhou Protech Technology Co., Ltd
9) Open the cooling chamber electromagnetic release valve, to deflate the furnace.84pZhengzhou Protech Technology Co., Ltd
2, furnace steps:84pZhengzhou Protech Technology Co., Ltd
1) Open the shut-off valve for each water-cooling system, to ensure smooth drainage, furnace work during drainage temperature should not exceed 35 ℃ to prevent fouling.84pZhengzhou Protech Technology Co., Ltd
2) Open the lid, the workpiece into the furnace cooling chamber, and then close the lid.84pZhengzhou Protech Technology Co., Ltd
3) Start a mechanical pump.84pZhengzhou Protech Technology Co., Ltd
4) Open the vacuum valve for cooling water cooling chamber is evacuated, when the cooling chamber and heating chamber vacuum degree similar to the following procedures can be carried out.84pZhengzhou Protech Technology Co., Ltd
5) Open the vacuum insulating door.84pZhengzhou Protech Technology Co., Ltd
6) the workpiece, the workpiece vehicle into the heating chamber.84pZhengzhou Protech Technology Co., Ltd
7) of the workpiece, the workpiece vehicles decreased the workpiece parked in the hearth.84pZhengzhou Protech Technology Co., Ltd
8) of the workpiece the car back to the cooling chamber.84pZhengzhou Protech Technology Co., Ltd
9) Close the vacuum insulating door.84pZhengzhou Protech Technology Co., Ltd
10) takes heat chamber vacuum valve.84pZhengzhou Protech Technology Co., Ltd
11) the degree of vacuum ≤670Pa, start mechanical increase pump.84pZhengzhou Protech Technology Co., Ltd
12) When the degree of vacuum to 2.7Pa, ohmic heating, heating, insulation (according to process requirements).84pZhengzhou Protech Technology Co., Ltd
13) holding the end off the heating chamber, vacuum valve and stop the mechanical cooling chamber to increase the pressure pump.84pZhengzhou Protech Technology Co., Ltd
14) a mechanical pump to stop working.84pZhengzhou Protech Technology Co., Ltd
15) Open the vacuum insulating door. At the same time84pZhengzhou Protech Technology Co., Ltd
16) off the furnace heating was stopped.84pZhengzhou Protech Technology Co., Ltd
17) Work car into the heating chamber.84pZhengzhou Protech Technology Co., Ltd
18) handling the workpiece cylinder rises, the workpiece vehicle hold the workpiece.84pZhengzhou Protech Technology Co., Ltd
19) Work car and returned to the cooling chamber piece.84pZhengzhou Protech Technology Co., Ltd
20) Close the vacuum insulating door.84pZhengzhou Protech Technology Co., Ltd
21) to the cold chamber filled with nitrogen, the pressure to 0.06MPa.84pZhengzhou Protech Technology Co., Ltd
22) to start the cooling fan.84pZhengzhou Protech Technology Co., Ltd
23) the workpiece is cooled to about 120 ℃, shut fan.84pZhengzhou Protech Technology Co., Ltd
24) On a cold chamber release valve, the furnace inflated to atmospheric conditions. 25) Open the lid, remove the workpiece.84pZhengzhou Protech Technology Co., Ltd
3, shutdown84pZhengzhou Protech Technology Co., Ltd
1) Turn off the switch back filled with nitrogen.84pZhengzhou Protech Technology Co., Ltd
2) close the pneumatic air supply switch.84pZhengzhou Protech Technology Co., Ltd
3) When the oven temperature drops below 120 ℃, turn off the main switch and the part of the water shut-off valve.84pZhengzhou Protech Technology Co., Ltd
4) pull the power switch.84pZhengzhou Protech Technology Co., Ltd
Vacuum furnace installation, protech Furnace Co., Ltd., Zhengzhou, provide detailed simple installation steps, which you do not have to worry about;84pZhengzhou Protech Technology Co., Ltd
For more information, please visit Zhengzhou protech Furnace Co., Ltd., the official website:http://www.lab-furnace.com

HOT PRODUCTS

  • Continuous feeding and discharging multi temperature zone large diameter rotary furnace
  • Tube type vertical lifting bell cover furnace
  • 1200 ℃ touch screen high-temperature vacuum tube furnace
  • Large vertical tube furnace with preheating

Inquiry

Please leave a message here. We will reply you in 24 hours.

live chat customer service