Preparation of high temperature vacuum tube furnace

Time:2015-06-25 09:26:49
Preparation of high-temperature vacuum tube furnace before the operation6pcZhengzhou Protech Technology Co., Ltd
Preparations6pcZhengzhou Protech Technology Co., Ltd
1. Design heating and cooling curve, heating rate not higher than 10 ℃ / min, the cooling rate should be lower than 15 ℃ / min.6pcZhengzhou Protech Technology Co., Ltd
2. clean environment. Start using the tube furnace, check the mechanical pump oil line6pcZhengzhou Protech Technology Co., Ltd
3. week in marking above, remove both ends of the cover, with a vacuum cleaner to clean corundum tube.6pcZhengzhou Protech Technology Co., Ltd
4. The sample is pushed into the boat just (10cm constant length) and the central tube furnace.6pcZhengzhou Protech Technology Co., Ltd
5. stuffed two insulated furnace plug, so that the end of the second furnace plug flush with the side of the furnace.6pcZhengzhou Protech Technology Co., Ltd
6. Install the flange gas stove, make sure the gasket groove fall.6pcZhengzhou Protech Technology Co., Ltd
Filling the working gas (hydrogen gas as the working gas)6pcZhengzhou Protech Technology Co., Ltd
1. Turn on the hydrogen gas line, each joint with soapy water leak, confirm no leakage.6pcZhengzhou Protech Technology Co., Ltd
2. Recognizing the valve is closed.6pcZhengzhou Protech Technology Co., Ltd
3. Rotate the knob counterclockwise to open a hydrogen cylinder main valve knob clockwise, slowly open the outlet valve, the outlet pressure at 0.1MPa.6pcZhengzhou Protech Technology Co., Ltd
4. Turn the mechanical pump power, open the two valves tube furnace outlet valve and a mechanical pump gas on the road, pumping five minutes.6pcZhengzhou Protech Technology Co., Ltd
5. Close the two valves mechanical pump gas on the road, closed tube furnace outlet valve, shut mechanical pump.6pcZhengzhou Protech Technology Co., Ltd
6. counter clockwise to open the pneumatic control valve, so that the arrow points to the "on" position.6pcZhengzhou Protech Technology Co., Ltd
7. counter clockwise to adjust the meter knob to make the indication in 20ml / min.6pcZhengzhou Protech Technology Co., Ltd
8. Turn the knob counter-clockwise, the intake valve open tube furnace until the pressure gauge reads zero.6pcZhengzhou Protech Technology Co., Ltd
9. Open the tube furnace inlet valve, the outlet valve open red hydrogen gas on the road.6pcZhengzhou Protech Technology Co., Ltd
10. After pass hydrogen over ten minutes, you can start heating tube furnace. Before heating, flow meter knob counterclockwise to adjust, so that the speed Erlenmeyer flask bubbles appear for 2 / sec.

HOT PRODUCTS

  • Continuous feeding and discharging multi temperature zone large diameter rotary furnace
  • Tube type vertical lifting bell cover furnace
  • 1200 ℃ touch screen high-temperature vacuum tube furnace
  • Large vertical tube furnace with preheating

Inquiry

Please leave a message here. We will reply you in 24 hours.

live chat customer service