Protech simple tube furnace
Time:2015-03-23 09:02
Tube furnace for laboratory requirements, loading and unloading intermittent manual loading, unloading. When the cartridge is placed on the loading spout stand open and take the baked tube end sealing cap and put the cartridge with the cartridge holder and then sealing cap installed on the furnace tube flange and tighten the clamp bolts.
Then Walter craft atmosphere, until the inner tube furnace tube temperature sintering furnace oxygen content to process requirements. Product after sintering process is completed, the process should continue to Walter small amount of atmosphere and cool until the furnace temperature is lower than the process requirements, the only open tube furnace tube sealing cap to remove the product.
I will further increase investment in science, in order to "customer satisfaction" for the purpose, and constantly improve product quality and better service for customers.